Project Description

Project Description

By retrofitting existing Metal Halide lamps with LED, The City of Peoria saw nearly $26,000 in annual savings.

Due to the reliability of LED technology, PLG’s SBX Retrofit system significantly reduces the cost of maintenance. By utilizing this system, the city of Peoria saw an 86% reduction in annual maintenance costs.

Project Details

Location: 8866 W Thunderbird Rd, Peoria, AZ

Type of Client: Municipality

Lighting Application: Area Lighting

Reference: Dave Stanek / Park Superintendent

DETAILED CASE STUDY (PDF)